|
Latest Articles
|
 |
Specification of Ducting Works torrent |
| Download torrent: |
|
| Info hash: |
35863231852627637602E60EAF9A8B1E09C1BFFA |
| Category: |
Categories >
Other torrents
|
| Trackers: |
udp://tracker.coppersurfer.tk:6969/announce
udp://9.rarbg.me:2850/announce
udp://9.rarbg.to:2920/announce
udp://tracker.opentrackr.org:1337
udp://tracker.leechers-paradise.org:6969/announce
|
|
| Health: |
|
| Torrent language: |
|
| Total Size: |
839.68 KB |
| Number of files: |
|
| Uploader: |
|
| Torrent added: | 2016-09-15 13:43:26 |
|
Torrent Description
Specification of Ductwork This document describes in detailed the material use for Ducting works and its components. The document is specified according to the desired project.
File Size: 2mb File Type : MS Word 2010
Date Released: 15.September.2016
Preview:
1 ‑ GENERAL
1.01 SUMMARY
A. Provide labor, materials, equipment and services, and perform operations required for complete installation of the Pre-insulated Ductwork and related work as indicated on the drawings and specified herein.
B. Work Included: The work shall include, but not be limited to Pre-insulated and Galvanized metal sheet Duct work.
C. Related Work Specified Elsewhere 1. Basic Mechanical Requirements 2. Basic Mechanical Materials and Methods
1.02 QUALITY ASSURANCE
A. Materials shall conform to the latest edition of industry standards and reference specifications specified herein and to applicable codes and requirements of local authorities having jurisdiction.
1. Fabrication of pre-insulated panels shall comply with Fire Mideast Product listing-MPL- and with Factory Production Control-FPC-. 2. Fabrication and installation of ductwork shall conform to applicable XXXX codes and regulations.
B. System Performance: The system has been designed for optimum performance. Any subsequent alterations to the design must be accompanied by a computer analysis or hand calculations showing that the proposed alterations will still provide the original design volume without increasing the system total pressure. Any unavoidable field changes to the original design (offsets, etc.) shall be reported so that accurate” as built" operating parameters may be established
Related Torrents
|