Primavera P6: Plan a real 132 kV Transmission Line Project https://WebToolTip.com Published 6/2026
MP4 | Video: h264, 1920x1080 | Audio: AAC, 44.1 KHz, 2 Ch
Language: English | Duration: 3h 51m | Size: 2.38 GB
Plan, monitor, and report a real 132 kV transmission line EPC project in Primavera P6
What you'll learn
Plan and schedule a complete 132 kV transmission line project using Primavera P6.
Create a professional Work Breakdown Structure (WBS) based on a real engineering project.
Develop project activities, durations, relationships, and project calendars.
Create and analyze the Critical Path (CPM) for a transmission line project.
Apply Primavera P6 planning and scheduling best practices used in EPC and construction projects
Requirements
No prior Primavera P6 experience is required